Triggertiming relative to the the time of the beam crossing S2. These times are taken from notebooks 2 and 3 of the 1994 data run.
The zero time is defined as the time of the beam crossing the beam counter S2. The cable from S2 to the patch panel is RG62 (93 ohm), 24 feet long. This produces a delay of 29 ns. The transit time in the photomultiplier is estimated to be 30 ns, therefore, patch panel time = 60 ns in this system.
The S2 patch panel is in rack 4; the discriminator is located at 8-1-7-4 (rack-crate-unit-subunit) 16 ns away.
signal time (ns)
5/3/94 data
beam crosses S2 0
S2 at FT rack 4 panel 60
pretrigger at panel 240
pretrigger fanout 280
beam pwc input to
to stobe fanout 300
at pwc A4 input 325
strobe TPX mlu (4616) 690
strobe level_1 790
clockstop at MDM 825 (760?)
strobe 4508 prescale 890
level_1 out at spy 855
level_1 429 output 940
level_1 disc output 980
beam.dt disc output 245
tpx1 gate 470
tpx2 gate 477
tpx3 gate 493
level_2 strobe 10 us
tdc stop 11.78 us
//end file